Product Details:
Payment & Shipping Terms:
|
Warranty: | 12 Months, Technical Support For Machine Lifetime | After-Sale Service: | 24 Hours/7 Days By Technicians |
---|---|---|---|
Players: | 2 | Application: | Amusement Park, Shopping Mall, VR Zone, Indoor Playground, Mobile Truck, Events |
Highlight: | 360 VR chair simulator,indoor VR game machine,amusement center VR chair |
Vr Manufacturer Amusement Center Double 360 VR Chair Indoor Playground Game Machine
Product Introduction:
Product Parameter
Product name | YHY Double VR360 Simulator |
Game Quantity | 15 thrilling games, 2 shooting games, 8 other games; 3-8 minutes |
Voltage | 220V |
Frequency | 50-60Hz |
Watt | 5.0kw |
Screen*1 | 42'' |
Control Panel | 10'' touch screen |
VR Glass *2 | DPVR E3S 4K |
Joysticks | yes |
Sense Effect | wind effect |
Structure | Iron, Acrylic, lighting |
Machine Size | L164*W170*H280cm |
Machine weight | 650kg |
Max Load | 200kg |
Packing size | 180*175*230cm/ 7.25cbm/750kgs |
Warranty | a one-year warranty and lifetime technical support for the machine. |
After-Sale Service | Our technicians are available 24/7 to assist you. |
Product Packing
We warmly welcome customers from around the world to visit our factory and company.
Discover our R&D innovation capabilities as we remain dedicated to creating market-leading products for our long-term partners.
YHY & Customers
FAQ:
1. Are you a manufacturer or a trader?
We act as both a manufacturer and a trader. We produce VR equipment in our own dedicated facilities and also provide comprehensive product solutions to cater to the diverse needs of our clients.
2. What types of VR content (movies/games) do you offer?
Each VR experience typically lasts 3–10 minutes—this duration is optimized to maintain user engagement while allowing high throughput for commercial venues (e.g., arcades, theme parks) to serve more customers.
3. What shipping options and terms do you provide?
4. What's the payment term?
5.What is the minimum order quantity, and how long is the lead time for shipping?
MOQ: 1 unit. We welcome both small-batch test orders and large-volume bulk purchases to support your business needs (e.g., initial market testing or full venue outfitting).
Lead Time: After receiving your 30% deposit, we will complete production and quality inspection within 7–15 working days. Once the full balance is received, we will arrange shipment immediately—with a typical transit time of 15–45 days, depending on your destination port and chosen shipping method
Contact Person: Angela
Tel: 0086 18078828530
Fax: 86-20-39939909